
PHOTO-54429436 · Photographs · September 1964
New Haven Railroad EMU at Greenwich, Connecticut, September 1964
The New Haven Railroad
A New Haven Railroad EMU at Greenwich in 1964
Read item & source notesCOLLECTION 093 · SGC-93
New Haven · North Haven · Bridgeport · Waterbury · Greenwich · Connecticut
Beyond the station: locomotives, shops, freight yards and the people who kept southern New England moving.

1872 is the corporate formation date, not the first train in every town. Stations, yards and predecessor lines have separate dates.
LOOK CLOSER · OPEN ANY IMAGE
1957
1970s postcard of two Alco FA-1 units at New Haven Yard in mid-1957
circa 1913
Divided back postcard of the New Haven streetcar viaduct, with a southbound passenger train in the adjacent cut
September 1964
A New Haven Railroad EMU at Greenwich in 1964
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
1977
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
21 July 1968
Electric multiple units (left), FL9, and EP5 of the New Haven Railroad at the yard at New Haven in July 1968
COLLECTION HISTORY
The New York, New Haven and Hartford Railroad took shape in 1872, joining a network whose roots reached back through earlier companies. To passengers it meant a timetable and a station. Behind that public face stood yards, repair shops, bridges, signals and a workforce that made every journey possible. UConn’s company archive follows the railroad through 1969, preserving the records behind both the familiar name and its many predecessors. [SGC93-S1]
New Haven’s yards and North Haven’s Cedar Hill facilities show the system at work. Freight cars had to be sorted into new trains; locomotives needed fuel, inspection and repairs. The gallery moves from trains on the line to the buildings and structures behind them. Federal engineering-survey photographs made after the company’s final years record surviving shops, rather than pretending to show their busiest moment. [SGC93-S1]
Wartime labor brought another history to Cedar Hill. UConn’s research describes the first group of roughly 300 Mexican workers arriving in January 1944 after a long journey north. Around a thousand worked for the railroad during the war. Former shop space became dormitory accommodation. Their presence belongs in the story of the railroad as much as its locomotives: these men helped keep a heavily used transportation system operating while far from home. [SGC93-S2]
Later photographs follow electric and diesel equipment at New Haven, Greenwich, Bridgeport and Waterbury, and show remnants of Cedar Hill’s earlier scale. A railroad photograph can hold several dates at once: when equipment was built, when a picture was taken and when a postcard was printed. The captions keep those distinctions visible wherever the source provides them. [SGC93-S1]
1872 is the corporate formation date, not the first train in every town. Stations, yards and predecessor lines have separate dates.
THE SEARCHABLE CATALOG
Search includes catalog notes and the OCR text included with this edition. OCR may misread names or dates; use the original scan to verify a match.

PHOTO-54429436 · Photographs · September 1964
The New Haven Railroad
A New Haven Railroad EMU at Greenwich in 1964
Read item & source notes
PHOTO-33829020 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-33829019 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-33829017 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-33829023 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-33829029 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-33829027 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-33829024 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-33829014 · Photographs · 1977
The New Haven Railroad
Jack Boucher’s 1977 engineering-survey photograph records the surviving New Haven railroad yards and shops. This is a later survey view, after the New Haven Railroad’s separate corporate life ended.
Read item & source notes
PHOTO-54434712 · Photographs · 21 July 1968
The New Haven Railroad
Electric multiple units (left), FL9, and EP5 of the New Haven Railroad at the yard at New Haven in July 1968
Read item & source notes
PHOTO-54435069 · Photographs · 21 July 1968
The New Haven Railroad
New Haven RS-3 #558 shuttling PRR coaches at New Haven, Connecticut on July 21, 1968
Read item & source notes
PHOTO-54429330 · Photographs · 21 July 1968
The New Haven Railroad
New Haven FL9 #2033 with train #10, the Murray Hill , arriving at New Haven, CT on July 21, 1968
Read item & source notes
PHOTO-48847685 · Photographs · 1962-09
The New Haven Railroad
A New Haven Railroad train at Bridgeport station in September 1962
Read item & source notes
PHOTO-54435073 · Photographs · 24 August 1968
The New Haven Railroad
New Haven GP9 #1206 and other locomotives and an RDC next to the Waterbury, Connecticut station on August 24, 1968
Read item & source notes
PHOTO-113041038 · Photographs · 1925
The New Haven Railroad
The North and Eastbound classification yard of Cedar Hill Yard in New Haven, Connecticut, where trains headed north towards Hartford, northeast towards Middletown, or east towards New London were assembled.
Read item & source notes
PHOTO-113041037 · Photographs · 1925
The New Haven Railroad
A collage of four images of train operations at Cedar Hill Yard in New Haven, Connecticut. At top left, a steam locomotive pulls a train. At top right, two speeders are seen. At bottom left, a boxcab electric locomotive is seen. At bottom right is a general view of part of the yard.
Read item & source notes
PHOTO-112815809 · Photographs · 2021-11-24
The New Haven Railroad
These tracks were once part of the formerly extensive yards at Cedar Hill Yard, but they have long been abandoned and nature has begun to reclaim the land.
Read item & source notes
PHOTO-122517347 · Photographs · 28 August 2022
The New Haven Railroad
The abandoned coaling tower in Cedar Hill Yard in August 2022
Read item & source notesExtract the ZIP and open START_HERE.html. It includes the catalog, selected images, acquired source text, credits and a searchable SQLite database. New photo additions are hosted in the SGC media library and require an internet connection; original bundled images remain available offline.